Enhancing cooling redundancy at Blacktown Hospital’s Data Centre for Western Sydney Local Health District

A joint approach delivered by EkkoSense APAC partner Treske Pty Limited, in collaboration with Ecogreen Electrical & Mechanical, Air Water Power, and Vertiv, provides real-time data centre monitoring, reduction of cooling related energy consumption and risk removal of single point of failure architecture.
Blacktown Hospital in Australia, under the Western Sydney Local Health District (WSLHD), operates a 25-rack data centre housing critical IT infrastructure essential to healthcare delivery. After an incident exposed a single point of failure in the existing cooling setup, WSLHD approached Treske Pty Limited to review and improve the data centre’s cooling architecture.

The Challenge
Despite a seemingly resilient configuration, the existing cooling system had a critical flaw. Here’s what the team uncovered during their initial assessment.
The original cooling system featured the following design elements:
- 3 x 60kW Liebert PEX chilled water units
- Operating in a 2+1 active/standby configuration
Despite redundancy in unit numbers, all three units relied on the same chilled water supply, creating a critical single point of failure. When this common supply failed, the data centre overheated, risking vital hospital services.
“When the chilled water supply failed, the entire cooling system was compromised. We realised the need to design out this risk immediately.” Technical Services Manager, Western Sydney Local Health District.
Collaborative Solution Approach
TResolving this issue required seamless collaboration between multiple specialist partners. Together, they devised a robust and future-proof solution.
The project involved the following key contributors and responsibilities:
- Treske Pty Limited – Lead consultant and systems integrator
- EcoGreen Electrical & Mechanical – Electrical installation and power reconfiguration
- Air Water Power – Project management and mechanical installation
- Vertiv – Commissioning of CRAC (Computer Room Air Conditioning) units
ESG in Practice: Efficiency, Transparency, and Responsibility
Integrating EkkoSense from the design phase enabled an operation born with ESG principles embedded from day one.
The partnership strengthened Everest’s environmental governance and positioned the company as a leader in sustainability among clients, investors, and stakeholders. Key ESG gains include:
- Environmental Sustainability: Direct reduction in carbon emissions by optimizing cooling systems — one of the largest sources of energy consumption in data centers;
- Transparent Reporting: The platform allows for accurate, frequent data generation on energy efficiency, thermal performance, and operational metrics — essential for audits and regulatory compliance;
- Circular Economy & Operational Efficiency: With AI-driven thermal control, equipment wear is reduced, and asset lifecycle is extended.
“Today, we operate based on data. And that changes everything: it changes how we make decisions, how we plan, and even how our team thinks. Efficiency has become routine, and sustainability has become a deliverable — not just a message”, added Gisele Santos.
System Upgrade Details
To address the risk and build in true resilience, a significant cooling and electrical upgrade was undertaken. The system was re-engineered with a hybrid approach that prioritised redundancy and fault tolerance. The following improvements were delivered as part of the upgrade.
Cooling Architecture Redesign
- Removed 1 x chilled water Liebert PEX unit
- Installed 2 x air-cooled Liebert PEX units
- Developed a hybrid team of 2 (1 x air, 1 x chilled water) in an active/standby configuration
- Integrated through Vertiv iCOM controllers to optimise performance and automate redundancy
Electrical Resilience
Power sources to cooling units were split across two distribution boards, each backed by different substations. This significantly improved electrical fault tolerance and ensured uptime during future electrical works
“Our role was to manage the mechanical and project complexities to ensure timely delivery without disruption. The result is a much more robust cooling ecosystem.” George Kyprianou, Managing Director, Air Water Power
“Working in a live hospital environment requires planning and diligence. We ensured all electrical upgrades were carried out with zero unplanned outages and total compliance.” Adam Wright, Director, EcoGreen Electrical & Mechanical.
Data-Driven Monitoring with EkkoSense
To ensure ongoing performance visibility and unlock future efficiencies, advanced real-time monitoring was introduced.
The deployment of EkkoSense brought immediate value through:
- Capture of real-time thermal and airflow data
- Benchmarking of efficiency before and after the cooling upgrade
- Identification of optimisation opportunities to reduce cooling- related energy consumption
- Support for long-term sustainability and operational cost savings
EkkoSense Monitoring – Baseline and Post-Implementation Analysis
“EkkoSense was deployed prior to any changes in the data centre environment to establish a baseline of key operational data. This allowed for a direct comparison following the implementation of the new, fully redundant configuration.
As expected, the results confirmed that the reconfiguration did not adversely impact performance. With this validation, further analysis was conducted using EkkoSense data to identify additional opportunities for optimising environmental performance and reducing energy costs.” Robert Linsdell, General Manager, Ekkosense Asia Pacific.

Delivering in a Healthcare Environment
Upgrading critical infrastructure in a live healthcare setting requires precision, coordination, and care. This project demanded that all works be performed without disrupting essential services.
The following measures ensured safe and seamless delivery:
- Coordinated with WSLHD teams to schedule power works with zero unplanned outages
- Used EcoGreen’s healthcare-experienced electricians to perform compliant electrical reconfiguration
- Ensured mechanical integration was tightly managed by Air Water Power’s experienced project team
- Delivered full Vertiv commissioning to validate and verify system performance
Project Outcomes
The successful delivery of the project resulted in a range of improvements aligned with WSLHD’s operational and sustainability goals.
Key outcomes included:
- Elimination of the single point of failure in cooling architecture
- Deployment of a hybrid cooling system with dual-path redundancy
- Diversification of power supply across two substations
- Ongoing environmental monitoring via EkkoSense with actionable insights
- Seamless execution in a live healthcare environment
- Contribution to long-term energy efficiency and reliability goals
Conclusion
This project showcases the power of strategic collaboration in critical infrastructure. With Treske as the lead integrator, EcoGreen Electrical & Mechanical handling electrical works, Air Water Power delivering precise project management and mechanical install, and Vertiv ensuring system performance, Blacktown Hospital now benefits from a future-ready, efficient, and resilient data centre.
“This was more than just a cooling upgrade, it was a strategic uplift in reliability and sustainability. We’re proud to have delivered a solution that will serve WSLHD for years to come.”

Daniel Sargent
Managing Director
Treske Pty Limited
Download a pdf of this New South Wales data center case study.
See an instant video demo of EkkoSoft Critical in action as a data centre solution for Healthcare or contact the team behind this data centre optimisation project in Australia – Robert Linsdell and Kate Spillane.